PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core drilled holes for the electrical conduit at Elect. Room 284 Facing West (800x600).jpg Duct hangers at the 1st floor Facing South-East (800x600).jpg Installed conduit at IT-Phone Room 283 Facing South-West (800x600).jpg Installed foam along the columns to protect the stone panels Facing South-West (800x600).jpg Installed formwork for the 3rd floor slab on deck Facing East (800x600).jpg Installed hangers for the electrical conduits at the 2nd Floor Facing West (800x600).jpg Installed overhead conduita at the 1st floor Facing East (800x600).jpg Installed vent piping at the Sprinkler Room Facing East (800x600).jpg Started installing 2 gas piping at the 1st floor Facing East  (800x600).jpg
Previous pageNext page Installed formwork for the 3rd floor slab on deck Facing East (800x600)
Installed formwork for the 3rd floor slab on deck Facing East (800x600)